Education Projects

Educational Clients:

Arizona State University
Avondale Elementary School District
Cartwright School District
Chandler-Gilbert Community College
Gilbert Schools
Glendale Union High School District
Higley Unified School District
Mesa Public Schools
Maricopa Community College District
Roosevelt School District
San Carlos School District
Scottsdale Community College
Scottsdale Public Schools
Washington Elementary School District
University of Arizona

SDB has enjoyed working on contracts for numerous School Districts throughout the state of Arizona. Our range of work has included Construction Management at Risk, Design-Build, Job order Contracting, High-Tech systems, Site Improvements and Civil services. Throughout our experience with School Districts, we've faced many different types of challenges and have proved to be resilient. SDB understands what it takes to successfully complete District projects with challenges such as off-hour time constraints, alternative working conditions, and security/safety issues while maintaining a safe work environment at the school facility. We have performed work during summer breaks, during regular school hours and on many occasions we have worked weekends. With all of those considerations, we are able to perform quality work on time at a fair price. Have confidence knowing you're working with experienced School District project professionals.
Sample Projects:
Yuma Union High School District Walk-In Freezer
Yuma Union High School District
SDB provided preconstruction services that included drafting, design and engineering consulting and construction services for the installation of a new walk-in freezer. The installation was performed at an existing district warehouse and distribution center. City and Fire Department permitting assistance were part of the job. Work included, floor removal, freezer assembly, refrigeration system installation, electrical and plumbing.
- Delivery Method:
- Completed:
- Budget:
- Job Order Contract (JOC)
- October 2012
- $111,811
Hidden Hills Elementary School Generator
Paradise Valley Unified School District
PVUSD had an emergency generator fail at one of their largest elementary schools which caused great concern. SDB was called in to provide a new emergency generator, new masonry security and sound enclosure, and run new electrical leads to the existing switches that deliver power to the main circuit panel.
- Delivery Method:
- Completed:
- Budget:
- Job Order Contract (JOC)
- July 2011
- $76,319


ASU Sun Devil Skybox Renovations
Arizona State University
The 3,400 SF remodel included space reconfiguration, suite expansion and furniture installation. In addition to interior design and upgrades the exterior section seating was enhanced with new bleacher seats that allowed for a wider and more comfortable seating area.
- Delivery Method:
- Completed:
- Budget:
- Job Order Contract (JOC)
- September 2012
- $449,000


Elementary School Fencing at Seven Locations
Chandler Unified School District
The Chandler Unified School District contracted with SDB to replace approximately 3,500 linear feet of existing chain link fencing and install approximately 6,000 linear feet of new wrought iron fencing at seven elementary school locations. The schools were adjacent to city parks and for security reasons needed replacement fencing or fencing where none existed.
- Delivery Method:
- Completed:
- Budget:
- Job Order Contract (JOC)
- May 2012
- $801,000


Apache Junction High School Culinary Kitchen
Apache Junction High School
Reconfiguration classroom space into a full scale culinary kitchen. Work included electrical, HVAC, roof drainage, coordination and installation of commercial grade appliances and appropriate ventilation systems, new fire sprinkler system, floor resurfacing, new paint, ADA upgrades, new grease trap installation, and various civil site work.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- October 2011
- $850,000
- BWLP Architecture
Nursing and Health Innovation Instruction Kitchen
Arizona State University
Remodel of exisiting office space into a cooking classroom with a mock restaurant.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- February 2011
- $1,234,000
- LEA Architects
Sunland Elementary Improvements
Roosevelt Unified School District
Remodel 8 restrooms, install 8,000 s.f. concrete walkway, paint total exterior, new parking lot.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- August 2010
- $653,200
- Orcutt-Winslow
Mercado Nursing Simulation Lab
Arizona State University
Remodel of an existing space into a nursing simulation laboratory.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- July 2010
- $291,000
- Fore Dimensions
Jacaranda Hall
Chandler-Gilbert Community College
SDB served as the General Contractor for this 5,991 SF ground-up mixed use classroom and office building at the CGCC Pecos Campus.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 5,991 SF
- August 2008
- $935,000
- Gabor Lorant Architects
Memorial Union Plaza Renovation
Arizona State University
Demolition and installation of a custom shade structure and renovation of the existing plaza in the heart of the ASU campus.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- January 2009
- $1,500,000
- Studio MA Architects
School District Warehouse
Higley Unified School District #60
17,300 SF of warehouse space with minimal office Design-Build project. Starting with site development and preconstruction, the Design Team used a concrete-tilt construction method to build the warehouse shell. The warehouse area has a 22' clear height a custom rack system created by the DB Team.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Build
- 17,296 SF
- July 2008
- $2,195,000
- Dieterich Architectural Group, Inc.
Lattie Coor Elementary School Kitchen & Cafeteria Remodel
Avondale Elementary School District
Aside from creating a functional and enjoyable lunchtime experience for the students, the kitchen remodel incorporated high efficiency appliances that helped resolve the food safety and space issues, creating an environment that is efficient, safe and fully functional.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- July 2009
- $307,000
- ADM Group
Scottsdale Community College IT Building Renovations
Maricopa Community College District
Complete gut out and reconfiguration of an existing building to a High Tech I.T. training facility
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 1,262 SF
- January 2010
- $1,569,000
- Architectural Resource Team, Inc.
Mesquite Elementary School Renovation
Gilbert Public Schools
SDB was contracted for this two phase classroom expansion and renovation. Phase I involved adding 6,000 SF of classroom space to an existing building. Phase II consisted of adding 31,000 SF of new classrooms increasing the total size of classroom space by 250%. Site modification involved grading, surfacing and engineering the existing parking lot for the new building footprint. SDB also constructed the playground recreation area adjacent to the new site. Upgrades to data and communication lines were also performed.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- April 2007
- $5,284,805
- HDA Architects, LLC.
Patterson Elementary School Upgrades & New Building
Gilbert Public Schools
SDB was contracted to renovate and perform upgrades to the existing campus. The project consisted of adding a new 2,500 SF classroom building and the extension of restroom facilities. The overall mechanical upgrades to the campus were approximately 50,000 SF in size and performed during off hours and weekends.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- November 2006
- $3,238,000
- HDA Architects, LLC.
ERC Friesen Battery Lab
Arizona State University
Conversion of existing work space into new research lab.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- January 2010
- $309,000
- Architectural Nexus
Physics Chair Lab
Arizona State University
This CMAR renovation project involved remodeling a 5,000 SF technology lab. Construction included a 17 station Nano process high vacuum line, gas cabinets with custom gas monitoring and alarm system, HVAC installations, electrical bus and exhaust and fire sprinkler installation.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- CMAR
- 5000 SF
- May 2008
- $1,427,000
- DFDG
San Carlos High School Remodel
San Carlos Unified School District
Demo, disposed, furnished & installed all new interior finishes including flooring, finished walls, paint, ceilings, and some mechanical - plumbing & electrical installation, new projectors; included cafeteria & gym areas.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- August 2010
- $1,034,000
- SPS + Architects
Weather Up Water Lines
Arizona State University
Installation of 8 inch infrastructure waterline for new ASU sports complex.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- February 2010
- $651,600
- Stanley Consultants
Scottsdale Community College Parking Lot E
Maricopa Community College District
Demolition and mill of existing paving, excavated sub-grade, lime stabilization, grade and compacting, installed new storm drain and new parking lot security lighting.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contracting (JOC)
- August 2009
- $545,200
- Brooks Strand & Associates
Washington High School Culinary Arts Renovation
Glendale Union High School District
The scope of work included demolition of the existing interior food service facility. The installation of walk-in freezer, cooler box , commercial grade range and vent hood; built-in warming drawer, built-in combination microwave and convection oven. Upgrades to the grease interceptor, plumbing, gas, HVAC, exhaust system were included in the remodel along with the construction of a classroom.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Lump Sum
- 4,000 SF
- August 2008
- $520,000
- Gilliland / Brubaker Architects
Thunderbird High School Culinary Arts Renovation
Glendale Union High School District
This renovation project was designed with an updated look and new energy efficient equipment. The project scope included a complete demolition of the existing kitchen, replacing the outdated kitchen with state-of-the-art commercial cooking equipment and modern restaurant style stoves, ovens and dishwashers.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Lump Sum
- 4,000 SF
- August 2008
- $495,000
- Gilliland / Brubaker Architects
Apache Elementary School Bus Parking Lot
Scottsdale Unified School District
The district needed a bus lot with an increased capacity yard to serve the new bus fleet additions. The project was multi-phased so that daily bus operations could be maintained while the project was under construction. The project scope included a complete demolition of the existing parking lot and construction of a new bus yard.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Negotiated
- 50,000 SF
- November 2005
- $245,000
- Hess Roundtree, Inc.
Student Recreation Ball Field
Arizona State University
Remove existing softball fields, and install new irrigation and sod
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- December 2009
- $77,000
- Aqua Engineering
Medical Center Office Remodel
University of Arizona
Remodel existing office to new configuration.
- Delivery Method:
- Completed:
- Budget:
- Job Order Contract (JOC)
- August, 2007
- $46,600
Moon Valley High School Culinary Arts Renovation
Glendale Union High School District
Remodel of culinary arts room included installation of new chilled water system, new kitchen equipment, video monitoring and recording equipment, demonstration kitchen, new coolers, food preparation areas, dry storage and new cabinetry.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Negotiated
- 25,700 SF
- August 2009
- $830,000
- Gilliland / Brubaker Architects






