Governmental

Governmental Construction Projects

SDB has contracted on a variety of Governmental projects for Federal, State, County and Municipal entities over the past three decades. We maintain a sense of pride knowing that we have contributed to the growth and improvement of our great State and Nation. As a General Contractor working with government entities we make ourselves accountable for performing work at high security facilities. Our employees are background checked and compliant with E-verification and fingerprint requirements. We are able to offer many construction services that range from underground site infrastructure improvements to the construction of new buildings.

Share |

Federal Projects:

Department of Veterans Affairs Logo
E-85 Alternative Fuel System
Read More

E-85 Alternative Fuel System

Department of Veteran Affairs

Design/Build services to furnish and install a 5,000 gallon E-85 alternative fuel system operated by solar power for the Department of Veteran Affairs.

  • Delivery Method:
  • Completed:
  • Cost:
  • Design-Build
  • August 2012
  • $374,597
Arizona Department of Veterans' Services Logo
Phoenix Veteran's Home
Read More

Dining Room Expansion

Arizona Veterans Services - Phoenix, AZ

Dining room expansion for Arizona State Veterans. Constructed a new two story addition adjacent to the existing dining rooms (approximately 1,900 SF per floor) for a total of 3,800 SF in the existing courtyard. This project consisted of modifications to mechanical, plumbing and electrical systems to expand existing systems for the new area. Modifications to the existing fire sprinkler and fire alarm systems were required.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Negotiated
  • 3,778 SF
  • November 2009
  • $4,000,000
  • Fore Dimensions
United States Postal Service Logo
USPS Gilbert AZ Fiesta Annex
Read More

Gilbert AZ Fiesta Annex

United States Postal Service

Construction of 10,915 SF mail distribution center. Work included a CMU construction type building, with loading docks, truck well and site development.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Bid-Build
  • 10,915 SF
  • January 2010
  • $1,632,000
  • APMI, Inc
Central Arizona Project Logo
Central Arizona Project Canal

Dual Water Lines

Central Arizona Project

This project consisted of complete installation of over 13,000 linear feet of 4 inch and 12,000 linear feet of 16 inch PVC waterline along the Central Arizona Project Canal. The water-line was constructed from the existing City of Phoenix Tramanto Pump station, extending along the CAP canal, across Happy Valley Road, and terminating at the Central Arizona Project corporate headquarters. SDB Civil provided complete pipeline excavation, bedding, installation, backfill and testing services.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Engineer:
  • Qualification
  • 10 acres
  • January 2007
  • $1,364,000
  • CSA Engineering
Arrow upTop

State Projects:

Arizona Department of Veterans' Services Logo
Tucson Veteran's Home
Read More

Tucson Veteran's Home

Arizona Veterans Services - Tucson, AZ

The project is the second of its kind in the State of Arizona. The ±130,000 square foot LEED facility houses 120 occupants with accommodations such as single dwelling units, activity rooms, common dining areas, rehabilitation facility and outdoor courtyard space.

  • Delivery Method:
  • Size:
  • Completed:
  • Cost:
  • Architect:
  • Design-Build
  • 130,000 SF
  • November 2011
  • $26,400,000
  • Orcutt/Winslow
ASU Logo
ASU Memorial Union Plaza
Read More

Memorial Union Plaza Renovation

Arizona State University

Demolition and installation of a custom shade structure and renovation of the existing plaza in the heart of the ASU campus.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • January 2009
  • $1,500,000
  • Studio MA Architects
ASU Logo
ASU Physics Chair Lab

Physics Chair Lab

Arizona State University

This CMAR renovation project involved remodeling a 5,000 SF technology lab. Construction included a 17 station Nano process high vacuum line, gas cabinets with custom gas monitoring and alarm system, HVAC installations, electrical bus and exhaust and fire sprinkler installation.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • CMAR
  • 5000 SF
  • May 2008
  • $1,427,000
  • DFDG
ASU Logo
ASU - Weather Up Water Lines

Weather Up Water Lines

Arizona State University

Installation of 8 inch infrastructure waterline for new ASU sports complex.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • February 2010
  • $651,600
  • Stanley Consultants
ASU Logo

ERC Friesen Battery Lab

Arizona State University

Conversion of existing work space into new research lab.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • January 2010
  • $309,000
  • Architectural Nexus
ASU Logo
ASU Mercado Nursing Simulation Lab

Mercado Nursing Simulation Lab

Arizona State University

Remodel of an existing space into a nursing simulation laboratory.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • July 2010
  • $291,000
  • Fore Dimensions
University of Arizona Logo
University of Arizona Medical Office

Medical Center Office Remodel

University of Arizona

Remodel existing office to new configuration.

  • Delivery Method:
  • Completed:
  • Budget:
  • Job Order Contract (JOC)
  • August, 2007
  • $46,600
Tucson National Guard

Tucson Air National Guard Remodel

Arizona Air National Guard

Demolition and remodel of interiors at four building locations including parking lot upgrades.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Engineer:
  • MATOC
  • 15,000 SF
  • December 2009
  • $174,000
  • SWAIM Associates LTD
Arrow upTop

County Projects:

city of Mesa AZ logo
Mesa Main st BRT bus station
Read More

Main St. BRT Bus Station

City of Mesa

SDB was selected by Valley Metro to install 26 stations, transit signal priority, queue jump lanes, and dynamic message display signs along the new Bus Rapid Transit route in Mesa, Arizona. The BRT functions as a 12.5 mile long extension to the light rail system.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Bid-Build
  • 26 bus stops
  • November 2009
  • $5,800,000
  • TranSystems
city of phoenix logo
desert broom park
Read More

Desert Broom Park

City of Phoenix

SDB was contracted to perform preconstruction, design and general contracting services for this 4 acre park as part of the CMAR team selected by the City of Phoenix.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • CMAR
  • 4 Acres
  • December 2007
  • $2,950,000
  • Olsson & Associates
city of sedona logo
sedona wastewater reclamation plant

Wastewater Reclamation Plant Upgrades

City of Sedona

This project consisted of miscellaneous upgrades to the existing wastewater reclamation facility in the City of Sedona.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Engineer:
  • CMAR
  • 10 acres
  • October 2007
  • $1,925,600
  • CH2MHill Arizona
Arrow upTop

Municipal Projects:

city of Mesa AZ logo
Mesa Main st BRT bus station
Read More

Main St. BRT Bus Station

City of Mesa

SDB was selected by Valley Metro to install 26 stations, transit signal priority, queue jump lanes, and dynamic message display signs along the new Bus Rapid Transit route in Mesa, Arizona. The BRT functions as a 12.5 mile long extension to the light rail system.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Bid-Build
  • 26 bus stops
  • November 2009
  • $5,800,000
  • TranSystems
city of phoenix logo
desert broom park
Read More

Desert Broom Park

City of Phoenix

SDB was contracted to perform preconstruction, design and general contracting services for this 4 acre park as part of the CMAR team selected by the City of Phoenix.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • CMAR
  • 4 Acres
  • December 2007
  • $2,950,000
  • Olsson & Associates
city of sedona logo
sedona wastewater reclamation plant

Wastewater Reclamation Plant Upgrades

City of Sedona

This project consisted of miscellaneous upgrades to the existing wastewater reclamation facility in the City of Sedona.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Engineer:
  • CMAR
  • 10 acres
  • October 2007
  • $1,925,600
  • CH2MHill Arizona
city of mesa logo
mesa municipal building

Municipal Building Remodel

City of Mesa

Remodel of approximately 38,000 SF on three floors done in three phases. Included new mechanical equipment, electrical systems, and new interior and exterior finishes.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Low Bid
  • 38,000 SF
  • December 2006
  • $2,065,700
  • Saemisch Di Bella Architects, Inc
City of Chandler Logo
Ocotillo Water Reclamation Facility Electrical

OWRF Electrical

City of Chandler

SDB changed out the existing electrical gear at the Ocotillo Water Reclamation Facility in Chandler. The facility was fully operational and work had to be performed without any loss of power to the plant. Backup generators were used for the duration of the swap.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • March 2010
  • $1,200,000
  • Brown & Caldwell
Town of Wickenburg Municipal Pool Complex

Municipal Pool Complex

Town of Wickenburg

This project consisted of the design and construction of 3,000 square feet of buildings consisting of men/women's restrooms, showers/changing areas, enclosed equipment room, offices and storage area. With an eight-lane competition pool with integral zero entry play area with water features and a double loop water slide.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Build
  • 3,000 SF
  • June 2003
  • $1,078,000
  • Dieterich Architectural Group, Inc.
Tempe Logo
Diablo Stadium Lighting Installation
Read More

Diablo Stadium Lighting

City of Tempe

Removal of existing baseball field lighting system, SES, and transformer, and installation of a new light system and primary power connection.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Qualification
  • 2 baseball fields
  • April 2010
  • $832,000
  • Olsson Associates
City of Chandler Logo
Celebration Plaza water fountain in Chandler AZ

Celebration Plaza

City of Chandler

Celebration Plaza is a permanent monument near the center of Tumbleweed Park where the Chandler City Council recognizes organizations or individuals for the civic leadership, public outreach, outstanding personal service, and commitment to the community.

  • Delivery Method:
  • Completed:
  • Budget:
  • Job Order Contract (JOC)
  • May 2007
  • $673,000
town of superior municipal swimming pool

Municipal Swimming Pool

Town of Superior

Construction of a 4 lane pool with integral zero entry play area, fountain, and restrooms.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Build
  • N/A
  • July 2002
  • $577,000
  • Dieterich Architectural Group, Inc.
City of Tempe logo
Kiwanis Park sign
Read More

Kiwanis Park Ramada Renovations

City of Tempe

The Kiwanis Park JOC project included masonry work, installation of seven prefabricated ramada shade structures and upgrading ADA features throughout the 125 acre park. The compressed project time line, budget and value engineering requirements made the Kiwanis Park Ramada Installations project a perfect fit for JOC.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • July 2010
  • $568,200
  • Olsson Associates
city of phoenix logo

Regency Garage Grease Interceptor Upgrades

City of Phoenix

SDB installed 2 new grease interceptors and other upgrades, approximatley 20,000 SF area.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • June 2010
  • $175,000
  • CH2M-Hill
City of Goodyear Logo
Ocotillo Water Reclamation Facility Electrical

Fleet Vehicle Maintenance Facility Remodel

City of Goodyear

This JOC involved concrete demolition, installation of a new shade structure, new vehicle maintenance systems, landscaping and concrete paving.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • June 2008
  • $110,000
  • City of Goodyear