Governmental
SDB has contracted on a variety of Governmental projects for Federal, State, County and Municipal entities over the past three decades. We maintain a sense of pride knowing that we have contributed to the growth and improvement of our great State and Nation. As a General Contractor working with government entities we make ourselves accountable for performing work at high security facilities. Our employees are background checked and compliant with E-verification and fingerprint requirements. We are able to offer many construction services that range from underground site infrastructure improvements to the construction of new buildings.
Federal Projects:
E-85 Alternative Fuel System
Department of Veteran Affairs
Design/Build services to furnish and install a 5,000 gallon E-85 alternative fuel system operated by solar power for the Department of Veteran Affairs.
- Delivery Method:
- Completed:
- Cost:
- Design-Build
- August 2012
- $374,597
Dining Room Expansion
Arizona Veterans Services - Phoenix, AZ
Dining room expansion for Arizona State Veterans. Constructed a new two story addition adjacent to the existing dining rooms (approximately 1,900 SF per floor) for a total of 3,800 SF in the existing courtyard. This project consisted of modifications to mechanical, plumbing and electrical systems to expand existing systems for the new area. Modifications to the existing fire sprinkler and fire alarm systems were required.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Negotiated
- 3,778 SF
- November 2009
- $4,000,000
- Fore Dimensions
Gilbert AZ Fiesta Annex
United States Postal Service
Construction of 10,915 SF mail distribution center. Work included a CMU construction type building, with loading docks, truck well and site development.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 10,915 SF
- January 2010
- $1,632,000
- APMI, Inc
Dual Water Lines
Central Arizona Project
This project consisted of complete installation of over 13,000 linear feet of 4 inch and 12,000 linear feet of 16 inch PVC waterline along the Central Arizona Project Canal. The water-line was constructed from the existing City of Phoenix Tramanto Pump station, extending along the CAP canal, across Happy Valley Road, and terminating at the Central Arizona Project corporate headquarters. SDB Civil provided complete pipeline excavation, bedding, installation, backfill and testing services.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Engineer:
- Qualification
- 10 acres
- January 2007
- $1,364,000
- CSA Engineering
State Projects:
Tucson Veteran's Home
Arizona Veterans Services - Tucson, AZ
The project is the second of its kind in the State of Arizona. The ±130,000 square foot LEED facility houses 120 occupants with accommodations such as single dwelling units, activity rooms, common dining areas, rehabilitation facility and outdoor courtyard space.
- Delivery Method:
- Size:
- Completed:
- Cost:
- Architect:
- Design-Build
- 130,000 SF
- November 2011
- $26,400,000
- Orcutt/Winslow
Memorial Union Plaza Renovation
Arizona State University
Demolition and installation of a custom shade structure and renovation of the existing plaza in the heart of the ASU campus.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- January 2009
- $1,500,000
- Studio MA Architects
Physics Chair Lab
Arizona State University
This CMAR renovation project involved remodeling a 5,000 SF technology lab. Construction included a 17 station Nano process high vacuum line, gas cabinets with custom gas monitoring and alarm system, HVAC installations, electrical bus and exhaust and fire sprinkler installation.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- CMAR
- 5000 SF
- May 2008
- $1,427,000
- DFDG
Weather Up Water Lines
Arizona State University
Installation of 8 inch infrastructure waterline for new ASU sports complex.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- February 2010
- $651,600
- Stanley Consultants
ERC Friesen Battery Lab
Arizona State University
Conversion of existing work space into new research lab.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- January 2010
- $309,000
- Architectural Nexus
Mercado Nursing Simulation Lab
Arizona State University
Remodel of an existing space into a nursing simulation laboratory.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- July 2010
- $291,000
- Fore Dimensions
Medical Center Office Remodel
University of Arizona
Remodel existing office to new configuration.
- Delivery Method:
- Completed:
- Budget:
- Job Order Contract (JOC)
- August, 2007
- $46,600
Tucson Air National Guard Remodel
Arizona Air National Guard
Demolition and remodel of interiors at four building locations including parking lot upgrades.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Engineer:
- MATOC
- 15,000 SF
- December 2009
- $174,000
- SWAIM Associates LTD
County Projects:
Main St. BRT Bus Station
City of Mesa
SDB was selected by Valley Metro to install 26 stations, transit signal priority, queue jump lanes, and dynamic message display signs along the new Bus Rapid Transit route in Mesa, Arizona. The BRT functions as a 12.5 mile long extension to the light rail system.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 26 bus stops
- November 2009
- $5,800,000
- TranSystems
Desert Broom Park
City of Phoenix
SDB was contracted to perform preconstruction, design and general contracting services for this 4 acre park as part of the CMAR team selected by the City of Phoenix.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- CMAR
- 4 Acres
- December 2007
- $2,950,000
- Olsson & Associates
Wastewater Reclamation Plant Upgrades
City of Sedona
This project consisted of miscellaneous upgrades to the existing wastewater reclamation facility in the City of Sedona.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Engineer:
- CMAR
- 10 acres
- October 2007
- $1,925,600
- CH2MHill Arizona
Municipal Projects:
Main St. BRT Bus Station
City of Mesa
SDB was selected by Valley Metro to install 26 stations, transit signal priority, queue jump lanes, and dynamic message display signs along the new Bus Rapid Transit route in Mesa, Arizona. The BRT functions as a 12.5 mile long extension to the light rail system.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 26 bus stops
- November 2009
- $5,800,000
- TranSystems
Desert Broom Park
City of Phoenix
SDB was contracted to perform preconstruction, design and general contracting services for this 4 acre park as part of the CMAR team selected by the City of Phoenix.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- CMAR
- 4 Acres
- December 2007
- $2,950,000
- Olsson & Associates
Wastewater Reclamation Plant Upgrades
City of Sedona
This project consisted of miscellaneous upgrades to the existing wastewater reclamation facility in the City of Sedona.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Engineer:
- CMAR
- 10 acres
- October 2007
- $1,925,600
- CH2MHill Arizona
Municipal Building Remodel
City of Mesa
Remodel of approximately 38,000 SF on three floors done in three phases. Included new mechanical equipment, electrical systems, and new interior and exterior finishes.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Low Bid
- 38,000 SF
- December 2006
- $2,065,700
- Saemisch Di Bella Architects, Inc
OWRF Electrical
City of Chandler
SDB changed out the existing electrical gear at the Ocotillo Water Reclamation Facility in Chandler. The facility was fully operational and work had to be performed without any loss of power to the plant. Backup generators were used for the duration of the swap.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- March 2010
- $1,200,000
- Brown & Caldwell
Municipal Pool Complex
Town of Wickenburg
This project consisted of the design and construction of 3,000 square feet of buildings consisting of men/women's restrooms, showers/changing areas, enclosed equipment room, offices and storage area. With an eight-lane competition pool with integral zero entry play area with water features and a double loop water slide.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Build
- 3,000 SF
- June 2003
- $1,078,000
- Dieterich Architectural Group, Inc.
Diablo Stadium Lighting
City of Tempe
Removal of existing baseball field lighting system, SES, and transformer, and installation of a new light system and primary power connection.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Qualification
- 2 baseball fields
- April 2010
- $832,000
- Olsson Associates
Celebration Plaza
City of Chandler
Celebration Plaza is a permanent monument near the center of Tumbleweed Park where the Chandler City Council recognizes organizations or individuals for the civic leadership, public outreach, outstanding personal service, and commitment to the community.
- Delivery Method:
- Completed:
- Budget:
- Job Order Contract (JOC)
- May 2007
- $673,000
Municipal Swimming Pool
Town of Superior
Construction of a 4 lane pool with integral zero entry play area, fountain, and restrooms.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Build
- N/A
- July 2002
- $577,000
- Dieterich Architectural Group, Inc.
Kiwanis Park Ramada Renovations
City of Tempe
The Kiwanis Park JOC project included masonry work, installation of seven prefabricated ramada shade structures and upgrading ADA features throughout the 125 acre park. The compressed project time line, budget and value engineering requirements made the Kiwanis Park Ramada Installations project a perfect fit for JOC.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- July 2010
- $568,200
- Olsson Associates
Regency Garage Grease Interceptor Upgrades
City of Phoenix
SDB installed 2 new grease interceptors and other upgrades, approximatley 20,000 SF area.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- June 2010
- $175,000
- CH2M-Hill
Fleet Vehicle Maintenance Facility Remodel
City of Goodyear
This JOC involved concrete demolition, installation of a new shade structure, new vehicle maintenance systems, landscaping and concrete paving.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- June 2008
- $110,000
- City of Goodyear