Parks and Recreation

Parks and Recreation Projects

Park and recreation projects, including both indoor and outdoor, is an area that SDB has a great amount of experienced with. One of the many benefits of working with SDB is that we are a "turn-key" general contractor. Park and Recreation clients can rely on one contractor to manage the construction and do the work. We perform ground work, site improvements and construct above ground structures. No project is too big or small as we have the staff and resources to manage projects of all sizes and schedules.

Share |
Head of screw

Parks and Recreation Clients:

Head of screw
  • City of Phoenix

  • City of Tempe

  • City of Chandler

  • Boys and Girls Clubs of America

  • Town of Wickenburg

  • Town of Superior

Head of screwHead of screw
  • City of Phoenix logo
  • City of Phoenix logo
  • City of Chandler Logo
  • Boys and Girls Clubs of America logo

Sample Projects:

Boys and Girls Club logo
Boys and Girls Club Jerry Colangelo Branch
Read More

Boys & Girls Club Jerry Colangelo Branch

Boys & Girls Club of Metropolitan Phoenix

In a wonderful opportunity to serve those who provide for our children, SDB was proud to build the 25,000 square-foot ground-up youth recreational facility. The project featured a full size basketball court, gymnasium, an outdoor sports field, basketball court with scoreboards, game room, cafeteria with commercial grade appliances, lockers and administrative offices.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Bid-Build
  • 24,958 SF
  • February 2009
  • $3,200,000
  • Bollinger & Cardenas
city of phoenix logo
desert broom park
Read More

Desert Broom Park

City of Phoenix

SDB was contracted to perform preconstruction, design and general contracting services for this 4 acre park as part of the CMAR team selected by the City of Phoenix.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • CMAR
  • 4 Acres
  • December 2007
  • $2,950,000
  • Olsson & Associates
Town of Wickenburg Municipal Pool Complex

Municipal Pool Complex

Town of Wickenburg

This project consisted of the design and construction of 3,000 square feet of buildings consisting of men/women's restrooms, showers/changing areas, enclosed equipment room, offices and storage area. With an eight-lane competition pool with integral zero entry play area with water features and a double loop water slide.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Build
  • 3,000 SF
  • June 2003
  • $1,078,000
  • Dieterich Architectural Group, Inc.
Tempe Logo
Diablo Stadium Lighting Installation
Read More

Diablo Stadium Lighting

City of Tempe

Removal of existing baseball field lighting system, SES, and transformer, and installation of a new light system and primary power connection.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Qualification
  • 2 baseball fields
  • April 2010
  • $832,000
  • Olsson Associates
City of Chandler Logo
Celebration Plaza water fountain in Chandler AZ

Celebration Plaza

City of Chandler

Celebration Plaza is a permanent monument near the center of Tumbleweed Park where the Chandler City Council recognizes organizations or individuals for the civic leadership, public outreach, outstanding personal service, and commitment to the community.

  • Delivery Method:
  • Completed:
  • Budget:
  • Job Order Contract (JOC)
  • May 2007
  • $673,000
town of superior municipal swimming pool

Municipal Swimming Pool

Town of Superior

Construction of a 4 lane pool with integral zero entry play area, fountain, and restrooms.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Build
  • N/A
  • July 2002
  • $577,000
  • Dieterich Architectural Group, Inc.
City of Tempe logo
Kiwanis Park sign
Read More

Kiwanis Park Ramada Renovations

City of Tempe

The Kiwanis Park JOC project included masonry work, installation of seven prefabricated ramada shade structures and upgrading ADA features throughout the 125 acre park. The compressed project time line, budget and value engineering requirements made the Kiwanis Park Ramada Installations project a perfect fit for JOC.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • July 2010
  • $568,200
  • Olsson Associates
ASU Logo
ASU SRC Ball Field

Student Recreation Ball Field

Arizona State University

Remove existing softball fields, and install new irrigation and sod

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • December 2009
  • $77,000
  • Aqua Engineering

Copyright 2013, SDB, inc. All rights reserved.