SDB remodeled the high school girl’s locker room and main gym. Scope of work included demolition of the shower area of the girl’s locker room and framing walls for new tile shower stalls, including ADA and plumbing improvements. Patterned tiles were installed on walls and floor, upgraded restroom fixtures, along with upgraded electrical. Additional shelving materials, HVAC, and new artificial turf with the school logo were installed in the locker room.
Owner
Irving Independent School District
Location
Irving, TX
Project Details