SDB repaired erosion damage and improved function at three areas of the Sonoqui Wash System in Queen Creek. Scope included site grading, new asphalt at access road and gate, grouted and hand placed riprap at retention basins and drainage swells, reworked berms, installed new drainage channels and concrete basins. Coordinated with survey, riprap and concrete subcontractors and vendors. Project was under budget and ahead of schedule.
Owner
Maricopa Flood Control District
Location
Queen Creek, Arizona
Project Details